5D BIM Transitioning Construction Designs


The future of 5D building information modelling (BIM) has been a long time coming. Way back in 1962, engineer and internet pioneer, Doug Engelbart, painted a clear picture. The architect of the future, Engelbart wrote:
would begin each project by entering a series of specifications and data – a six-inch slab floor, twelve-inch concrete walls eight feet high within the excavation, and so on. As the architect works, the revised scene appears on the screen, and the structure is taking shape. He examines it, adjusts it and these lists grow into an ever more-detailed, interlinked structure, representing the maturing thought behind the actual design.
Engelbart’s work sparked the invention of the mouse, the development of hypertext and networked computers. But his vision for a computer program that could spit out a fullycosted design remained elusive in his lifetime.
The evolution of BIM has been more fits and starts than leaps and bounds. Designs moved from drawing boards to two-dimensional CAD in the late 1950s. 3D BIM arrived in the 1990s, and by the year 2000 the revolutionary Revit added the time dimension in 2000 to give us access to 4D and 5D – with financial costs – became the next natural step.
Slow to Evolve
But construction remains among the least disrupted sectors. Despite the talk of digital twins, the next evolution of BIM, based on one recent report tracking technology uptake, is 37 percent of Australian construction companies already adopting BIM.
When I started my career as a quantity surveyor, I came to the profession with an unusual perspective. I’d spent four years studying architecture and a few years drafting, and I could see the gaping chasm between the two disciplines.
The way people design is very different to the way people measure. Because of that gap, quantity surveyors rarely trusted the information extracted from designs.
A successful construction project is achieved on the margins and project budgets rarely have spare capacity to undertake data-matching exercises. So, quantity surveyors have continued to rely on the tried-and-true methods of measurement and clients continue to pour over PDF reports.
Breaking The Barriers
Rider Levett Bucknall (RLB) is determined to continue building capability as an expert in 5D BIM, so recently teamed up with Investa and Willow to refine the data deliverables that everyone could trust.
Willow, a technology company that constructs digital twins for the built world, could offer insights into policies, framework and systems. RLB brought technical costs. Investa, one of Australia’s largest commercial office landlords, provided the pilot site at Sydney’s 151 Clarence Street and offered valuable feedback from a client’s perspective.
“5D BIM process relegates static reporting and reactive cost management to the past. Proactive nalysis, with reporting weekly or even daily, allows us to capture cost movements and discrepancies”
As part of the pilot project, RLB’s team, which included the supremely talented Kai Rala McKinnnon-Barbosa, Jennifer Wallace, and Matthew Han, rolled up their sleeves to prepare various reports. These ranged from dearness allowance (DA) cost plans to pre-tender estimates and interim cost updates, and embodied carbon pricing. Willow, as engineering project manager, validated the process. Here are the top five benefits 5D BIM delivers.
Real and right time monitoring. The 5D BIM process relegates static reporting and reactive cost management to the past.